Mounting and fixing in reaction to fire tests under the Construction Products Directive Ingestion-build-83346 BS 887:2008 supersedes BS 887:1982
$136.00
Description
BS 887:2008 supersedes BS 887:1982
in which a high-pressure or high-temperature transient can occur and for which the isolation of the containment building and the shutoff of the associated ventilation systems of the containment building is required
3:1989 recommends a calculation basis for permissible clear span for ceiling joists with access at a maximum spacing of 610 mm centre-to-centre
a) introduction of a new Annex ZA according to the latest template (in the format of TF N 678 rev 1 of 2015-06-02)
– adaptation of vehicle data
Mounting and fixing in reaction to fire tests under the Construction Products Directive Ingestion-build-83346 BS 887:2008 supersedes BS 887:1982
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.