Electronic fee collection. Requirements for pre-payment systems Ingestion-build-109673 — proline
$136.00
Description
— proline
This document specifies the methodology and procedure for determining the presence and minimization of other dangerous substances in relation with Annex II Para 1 Indent 3 of Directive 94/62/EC
Anchors and supports
BS EN 50121-2:2006 supersedes BS EN 50121-2:2002 which has been withdrawn
An emission factor is a value that relates the quantity of a pollutant released with an activity associated with the release of that pollutant
Electronic fee collection. Requirements for pre-payment systems Ingestion-build-109673 — proline1 Scope This technical report (TR) analyses requirements for a universal Pre Pay account system for EFC including the following issues: relations to other existing standards in this domain; the core requirements and functionality that must be provided. This technical report will show an analysis of the requirements for a universal prepay system and categorise possible different types of pre pay solutions, in terms of functionality, technical and legal
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 119.00
US$ 149.00
US$ 149.00
US$ 169.00
US$ 139.00
US$ 124.50
US$ 159.00
US$ 199.00
US$ 129.00
US$ 189.00
US$ 144.50
US$ 149.50
US$ 149.00